Solutions — Hospitality

Renovate while guests sleep.

Architectural film transforms hotel corridors, lobbies, elevators, and guestrooms without shutting down a single floor. No dust, no dumpsters, no lost revenue.

Up to 70%

less than full replacement

6 days

average corridor project

100%

occupancy maintained

Cost comparison

The math that matters to your GM.

Traditional renovation of a 200-room hotel corridor takes 6–8 weeks and requires closing the floor. Here's what that costs versus NELCOS.

Factor
Traditional Renovation
NELCOS
Project duration
6–8 weeks
5–7 days
Rooms offline
Full floor (20–30 rooms)
0 rooms
Lost ADR (200-room hotel)
$84,000–$112,000
$0
Dust & debris
Extensive — HVAC shutdown required
None
Material cost vs. replacement
Baseline
Up to 70% less
Warranty
Varies
10 years

ADR estimate based on $200 average daily rate. Actual savings vary by property size and rate.

Every surface. Every zone.

Corridors

Wood-grain, stone, and solid-colour films on door frames, skirting boards, and wall panels. Applied overnight, floor by floor.

Elevator interiors

Full cab wraps in brushed metal, marble, or custom patterns. Typical turnaround: 4–6 hours per cab.

Lobby & reception

Feature walls, reception desks, column cladding, and millwork refresh — without demolition.

Guestrooms

Wardrobe fronts, headboard panels, bathroom vanities, and minibar units. Minimal disruption per room.

F&B & event spaces

Bar fronts, banquette panels, and partition walls. Ideal for seasonal refreshes between peak periods.

Back-of-house

Staff corridors, service lifts, and utility doors — consistent finish throughout the property.

Technical specifications

Fire rating
Class A / EN 13501-1 B-s1,d0
Thickness
0.18 mm – 0.35 mm depending on series
Surface compatibility
MDF, plywood, steel, aluminium, glass, existing laminates
Adhesive system
Air-release pressure-sensitive, repositionable
Cleaning
Damp cloth, pH-neutral cleaners; bleach-safe on request
Warranty
10 years interior, 5 years exterior
Lead time (samples)
3–5 business days
Minimum order
No minimum for samples; project quotes on request

Case study

9 floors. 6 days. Zero lost bookings.

A 340-room full-service hotel in Vancouver needed to refresh its corridor programme ahead of a major conference season. Traditional renovation would have required closing three floors for eight weeks. NELCOS certified installers completed all nine floors in six days, working 10 PM–6 AM each night. The hotel maintained 100% occupancy throughout and avoided an estimated $126,000 in lost ADR.

340

Rooms

6 days

Total duration

$126K

ADR preserved

100%

Occupancy maintained

Get a project estimate in 24 hours.

Tell us your property size and target zones. We'll send a detailed scope and indicative cost within one business day.